
145 South 4th St
Higher is a better buy. 50 is "priced about right for what it is". The last step curves the raw advantage onto 0–100, so points stop being one-for-one at the extremes.
💵What this unit actually costs per month
35% of that payment is not the mortgage. The HOA fee alone is $66,360 over five years — money that buys you no equity. A calculator that defaulted the fee to zero would have quoted you $3,984.
FHA approval has expired on this project. An FHA buyer cannot use it today, and the fact that it once qualified and then stopped is worth asking the board about. Plan on a conventional loan — 5% down at the very least.
Minimum realistic down payment here: 5% · verify on HUD's lookup
Rate is the Freddie Mac PMMS 30-year average for the week of 2026-11-19 — a national survey figure, not a quote. Tax, insurance and closing costs are estimates; your own Loan Estimate is the real number.
This building's HOA fees
We haven't reconstructed a multi-year fee history for this building yet. We have one recorded fee on file ($1,106 in 2026), not enough for a trend yet. The listing shows $1,106/mo today. Upload its HOA docs and we'll build the full reserve & special-assessment report — free.
🏢 Get this building's free HOA report →✅ Positives
- 20% below model fair value
- 25% below its 2026 peak
- On market 260 days → strong negotiating leverage
- In-unit W/D
⚠️ Cons
- HOA $1106/mo
🚩 Red flags
- Very high HOA $1106/mo (full-service high-rise)
Photos
Price history (this unit)
- Sep 23, 2026 — Price Changed $693,888
- Sep 23, 2026 — Price Changed $693,888
- Aug 14, 2026 — Price Changed $729,000
- Aug 14, 2026 — Price Changed $729,000
- Mar 13, 2026 — Listed $794,999
- Mar 12, 2026 — Listed $794,999
Description
This remarkable ground floor, 2-story home is ready for you to move right in! Situated in the desirable, gated and secure Paseo Plaza community, it is your city retreat in vibrant downtown San Jose. The open downstairs floor plan features well appointed dining and living room areas and a brightly lit chefs kitchen with new G. E. stainless steel appliances. The entire unit has new environmentally friendly engineered floors and is professionally painted. New energy efficient light fixtures pour out abundant light. On the 2nd floor are two en-suite primary bedrooms with large walk-in closets. Laundry room. The sparkling bathrooms are upgraded with new Kohler toilets and Moen faucets. Keeping…






